Penetrators and Feed-Thrus

AMETEK SCP has decades of experience designing, manufacturing, and certifying submarine hull penetrators for naval platforms worldwide. Our penetrators and feed-thus are trusted in safety‑critical applications where long‑term reliability, pressure integrity, and compliance with stringent naval standards are essential. 
 

Penetrators & Feed-Thru Products

AMETEK SCP offers a comprehensive portfolio of electrical and optical hull penetration solutions designed to support a wide range of naval and subsea system requirements.
 

  • Fiber Optic Feed‑Thru Assemblies
  • Glass Sealed Penetrators
  • Hybrid Electrical/Optical Penetrators
  • Pressure Hull Penetrators (PHP / PPENS)
  • TR-317 Stuffing Tubes

Custom Design Features

Our penetrator designs incorporate proven technologies and flexible configurations to support both legacy programs and next‑generation naval systems.
 

  • M24231 Series, both Single Through Hull and Multi-Port Through Hull
  • Utilize Copper Contacts, Fiber Termini, Coax, RF Microwave, Hybrid, and Ethernet
  • Glass-to-Metal Seal Inserts
  • Modifications for Special Purposes
  • NES 524 Modular Replacement

High Quality Penetrator Materials

AMETEK SCP has extensive experience designing and manufacturing penetrators using a wide range of materials, including:
 

  • Stainless Steel
  • Monel® 400
  • K‑Monel® 500
  • Nickel Aluminum Bronze (NiAlBr)

World-Leading Testing Facilities

AMETEK SCP has testing facilities on site and can perform the following tests on all penetrators:
 

  • Hydrostatic Pressure
  • Pressure Cycling
  • Helium Leak Testing
  • Electrical Continuity
  • Dielectric Withstanding Voltage
  • Insulation Resistance
  • Thermal Cycling
  • Fiber Optic Attenuation

Leading Navy Certifications

AMETEK SCP holds a broad range of U.S. and UK naval certifications, demonstrating compliance with the most stringent quality, safety, and performance requirements for submarine and surface‑ship applications.
 

  • U.S. Navy PPD Fiber Optic Hull Penetrator
  • SUBSAFE Level 1 (U.S. Navy)
  • ISO 9001 Quality Management System
  • U.S. Navy Molding Manual
  • FIRST LEVEL Qualified (UK MOD SSCUP25)
  • UK MOD Certified Submarine Hull Gland Supplier (ASTUTE Submarine Program)